Battery Construction

From Saker
Revision as of 13:50, 21 June 2013 by Philip (talk | contribs) (Created page with 'The bikini pack is made up of two batteries, one either side of the motor in Saker (it will run on one battery pack, but it is designed to have 2 batteries for full race spec per…')
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigationJump to search

The bikini pack is made up of two batteries, one either side of the motor in Saker (it will run on one battery pack, but it is designed to have 2 batteries for full race spec performance).

Here is our 2013 schedule to complete both batteries and the commissioning 31st October:

  • FR4 separators (Done) [EC, PC]
  • 31st July - Complete battery enclosure design [PS, EC, PC]
  • 10th July - Tower #1 test (our batteries are made of 4 towers) [EC, PC]
  • 7th Aug - Enclosure complete [PS]
  • 31st July - Battery #1 build [EC, PC]
  • 10/11th August - Battery #1 test and test drive [EC, TP, PC]
  • Battery #2 build
    • 11th Sept - all modules built [EC, PC]
    • 9th Oct - all towers built [EC, PC]
    • 19th Oct - Battery #2 test [EC, TP, PC]
  • 31st Oct - Saker shake down complete [TG, EC, PC]