Difference between revisions of "Main Page"

From Saker
Jump to navigationJump to search
(Imported from TWiki by twiki2mediawiki.py)
(Imported from TWiki by twiki2mediawiki.py)
Line 50: Line 50:
 
* [[Connectorsand Cabling]]
 
* [[Connectorsand Cabling]]
 
* [[BMS. Web Home|BMS]]
 
* [[BMS. Web Home|BMS]]
* [http://www.brusa.biz/products/e_nlg5112.htm charger] - To go with metricmind BMS?  Need at least two chargers to get pack to full 750 V
+
* [[Charger]] - To go with metricmind BMS?  Need at least two chargers to get pack to full 750 V
 
* [[Water Pump]]
 
* [[Water Pump]]
  

Revision as of 03:15, 11 June 2008

219_0049.med.jpg

Our plan (target completion dates):

*Date* Description* *Responsible
tick.gif16th Dec Renault transaxle delivered to Ian [BT]
tick.gif4th Feb Brakes Suspension and axles chosen and fitted to Saker [BT, PC]
tick.gif19th Feb Motor drawings and spline details (DIN) delivered to Ian [PC, MS]
...
5th May Get motor and controller to NZ, bench test and deliver Motor to Ian for fitting to transaxle [PC, TP] (Controller will be available ex US early May and Motor has a 16 week lead time due to manufacturing time - not available from stock)
26th May Motor and Transaxle combined and delivered to BT [IJ]
2nd June Motor and transaxle mounted in Saker [BT]
21st June Temporary lead acid battery and electrical component installation complete [TP, PC, BT]
21st June Electric Saker "1st drive" (slow and timid!) [TP, PC, BT - Everyone invited]
...
30th August Battery upgrade complete [TP, PC, BT]
6th September Manfeild track test [TG, BT, TP, PC]
...
2008 Compete in first competitive race (NZSC Series) and don't come last.

Done or in progress:


TODO:


Other Stuff:


-- Main.PhilipCourt - 15 Dec 2007