Difference between revisions of "Main Page"

From Saker
Jump to navigationJump to search
(Imported from TWiki by twiki2mediawiki.py)
(Imported from TWiki by twiki2mediawiki.py)
Line 14: Line 14:
 
|...|| |  
 
|...|| |  
 
|-
 
|-
|5th May||Get motor and controller to NZ, bench test and deliver Motor to Ian for fitting to transaxle||[PC, TP] (Controller will be available ex US soon - a bit of slippage here...)  
+
|21st July||Get motor and controller to NZ||[PC] (Its on the way now via sea freight - a bit of slippage here...)  
 
|-
 
|-
|26th May||Motor and Transaxle combined and delivered to BT||[IJ]
+
|28th July||Bench test complete and deliver Motor to Ian for fitting to transaxle||[PC, TP]
 
|-
 
|-
|2nd June||Motor and transaxle mounted in Saker||[BT]
+
|18th Aug||Motor and Transaxle combined and delivered to BT||[IJ]
 
|-
 
|-
|21st June||Temporary lead acid battery and electrical component installation complete||[TP, PC, BT]
+
|25th Aug||Motor and transaxle mounted in Saker||[BT]
 
|-
 
|-
|21st June||Electric Saker "1st drive" (slow and timid!)||[TP, PC, BT - Everyone invited]
+
|13th Sept||Temporary lead acid battery and electrical component installation complete||[TP, PC, BT]
 +
|-
 +
|14th Sept||Electric Saker "1st drive" (slow and timid!)||[TP, PC, BT - Everyone invited]
 
|-
 
|-
 
|...|| |  
 
|...|| |  
 
|-
 
|-
|30th August||Battery upgrade complete||[TP, PC, BT]
+
|22nd Nov||Battery upgrade complete||[TP, PC, BT]
 
|-
 
|-
|6th September||[http://www.manfeild.co.nz/events.asp Manfeild] track test||[TG, BT, TP, PC]
+
|28th November||[http://www.manfeild.co.nz/events.asp Manfeild] track test||[TG, BT, TP, PC]
 
|-
 
|-
 
|...|| |  
 
|...|| |  
 
|-
 
|-
|2008||Compete in first competitive race ([[NZSC Series]]) and don't come last.||  
+
|Late 2008||Compete in first competitive race ([[NZSC Series]]) and don't come last.||  
  
 
|}
 
|}
Line 41: Line 43:
 
* [[Wheelsand Tyres]]
 
* [[Wheelsand Tyres]]
 
* [[Renault UN1transaxle]] (UN1-04)  
 
* [[Renault UN1transaxle]] (UN1-04)  
* [http://docs.google.com/Doc?id=dgb6fcnp_34dg4kjh Motor] - ordered (waiting for delivery when the controller is ready)
+
* [http://docs.google.com/Doc?id=dgb6fcnp_34dg4kjh Motor] - Shipping arranged 26th June (should take about 3 weeks, exact date to be confirmed)
 
* [http://docs.google.com/Doc?id=dgb6fcnp_53frhb3dfh Controller]  
 
* [http://docs.google.com/Doc?id=dgb6fcnp_53frhb3dfh Controller]  
 
* [[Clutch]] - yes we are using a clutch (long term we plan on having computer controlled gear change to eliminate the clutch)
 
* [[Clutch]] - yes we are using a clutch (long term we plan on having computer controlled gear change to eliminate the clutch)
 +
* [[Charger]] - Using three chargers to get pack fully charged in ~2hrs
  
  
Line 51: Line 54:
 
* [[Connectorsand Cabling]]
 
* [[Connectorsand Cabling]]
 
* [[BMS. Web Home|BMS]]
 
* [[BMS. Web Home|BMS]]
* [[Charger]] - To go with metricmind BMS?  Need at least two chargers to get pack to full 750 V
 
 
* [[Water Pump]]
 
* [[Water Pump]]
  

Revision as of 21:40, 28 June 2008

219_0049.med.jpg

Our plan (target completion dates):

*Date* Description* *Responsible
tick.gif16th Dec Renault transaxle delivered to Ian [BT]
tick.gif4th Feb Brakes Suspension and axles chosen and fitted to Saker [BT, PC]
tick.gif19th Feb Motor drawings and spline details (DIN) delivered to Ian [PC, MS]
...
21st July Get motor and controller to NZ [PC] (Its on the way now via sea freight - a bit of slippage here...)
28th July Bench test complete and deliver Motor to Ian for fitting to transaxle [PC, TP]
18th Aug Motor and Transaxle combined and delivered to BT [IJ]
25th Aug Motor and transaxle mounted in Saker [BT]
13th Sept Temporary lead acid battery and electrical component installation complete [TP, PC, BT]
14th Sept Electric Saker "1st drive" (slow and timid!) [TP, PC, BT - Everyone invited]
...
22nd Nov Battery upgrade complete [TP, PC, BT]
28th November Manfeild track test [TG, BT, TP, PC]
...
Late 2008 Compete in first competitive race (NZSC Series) and don't come last.

Done or in progress:


TODO:


Other Stuff:


-- Main.PhilipCourt - 15 Dec 2007