Difference between revisions of "Main Page"

From Saker
Jump to navigationJump to search
(Imported from TWiki by twiki2mediawiki.py)
(Imported from TWiki by twiki2mediawiki.py)
Line 16: Line 16:
 
|[[File:tick.gif|link=]]4th Aug||Get motor and controller to NZ||[PC] ([[Itsonthewaynowviaseafreight]] - a bit of slippage here...)  
 
|[[File:tick.gif|link=]]4th Aug||Get motor and controller to NZ||[PC] ([[Itsonthewaynowviaseafreight]] - a bit of slippage here...)  
 
|-
 
|-
|7th Aug||Bench test complete and deliver Motor to Ian for fitting to transaxle||[PC, TP]
+
|[[File:tick.gif|link=]]7th Aug||Deliver Motor to Ian for fitting to transaxle||[PC, TP]
 
|-
 
|-
 
|25th Aug||Motor and Transaxle combined and delivered to BT||[IJ]
 
|25th Aug||Motor and Transaxle combined and delivered to BT||[IJ]
Line 22: Line 22:
 
|1st Sept||Motor and transaxle mounted in Saker||[BT]
 
|1st Sept||Motor and transaxle mounted in Saker||[BT]
 
|-
 
|-
|20th Sept||Temporary lead acid battery and electrical component installation complete||[TP, PC, BT]
+
|12th Sept||Temporary lead acid battery and electrical component installation complete||[TP, PC, BT]
 
|-
 
|-
|21th Sept||Electric Saker "1st drive" (slow and timid!)||[TP, PC, BT - Everyone invited]
+
|12th Sept||Electric Saker "1st drive" (slow and timid!)||[TP, PC, BT - Everyone invited]
 +
|-
 +
|19th Sept||[http://www.speedshow.co.nz NZ Speed Show]||[PC, MS]
 
|-
 
|-
 
|...|| |  
 
|...|| |  
Line 43: Line 45:
 
* [[Wheelsand Tyres]]
 
* [[Wheelsand Tyres]]
 
* [[Renault UN1transaxle]] (UN1-04)  
 
* [[Renault UN1transaxle]] (UN1-04)  
* [http://docs.google.com/Doc?id=dgb6fcnp_34dg4kjh Motor] - Shipping arranged 26th June (scheduled to arrive 31st July)
+
* [http://docs.google.com/Doc?id=dgb6fcnp_34dg4kjh Motor]
 
* [[EVI200 Controller]]  
 
* [[EVI200 Controller]]  
 
* [[Clutch]] - yes we are using a clutch (long term we plan on having computer controlled gear change to eliminate the clutch)
 
* [[Clutch]] - yes we are using a clutch (long term we plan on having computer controlled gear change to eliminate the clutch)
Line 51: Line 53:
  
 
TODO:
 
TODO:
* [[Battery]]
+
* [[Battery]] - We have our temporary pack sorted
 
* [[DC-DC Converter]]
 
* [[DC-DC Converter]]
 
* [[Connectorsand Cabling]]
 
* [[Connectorsand Cabling]]

Revision as of 01:44, 20 August 2008

219_0049.med.jpg

Our plan (target completion dates):

*Date* Description* *Responsible
tick.gif16th Dec Renault transaxle delivered to Ian [BT]
tick.gif4th Feb Brakes Suspension and axles chosen and fitted to Saker [BT, PC]
tick.gif19th Feb Motor drawings and spline details (DIN) delivered to Ian [PC, MS]
...
tick.gif4th Aug Get motor and controller to NZ [PC] (Itsonthewaynowviaseafreight - a bit of slippage here...)
tick.gif7th Aug Deliver Motor to Ian for fitting to transaxle [PC, TP]
25th Aug Motor and Transaxle combined and delivered to BT [IJ]
1st Sept Motor and transaxle mounted in Saker [BT]
12th Sept Temporary lead acid battery and electrical component installation complete [TP, PC, BT]
12th Sept Electric Saker "1st drive" (slow and timid!) [TP, PC, BT - Everyone invited]
19th Sept NZ Speed Show [PC, MS]
...
22nd Nov Battery upgrade complete [TP, PC, BT]
28th November Manfeild track test [TG, BT, TP, PC]
...
Late 2008 Compete in first competitive race (NZSC Series) and don't come last.

Done or in progress:


TODO:


Other Stuff:


-- Main.PhilipCourt - 15 Dec 2007