Difference between revisions of "Main Page"

From Saker
Jump to navigationJump to search
(Imported from TWiki by twiki2mediawiki.py)
(Imported from TWiki by twiki2mediawiki.py)
Line 54: Line 54:
 
* [[Radiator]]
 
* [[Radiator]]
 
* [[DC-DC Converter]] - We will be using a small auxiliary battery which we will charge independently between races
 
* [[DC-DC Converter]] - We will be using a small auxiliary battery which we will charge independently between races
* [[Connectorsand Cabling]]
+
* [[Connectorsand Cabling|Connectors, cabling and fuses]]
  
 
TODO:
 
TODO:

Revision as of 11:03, 2 November 2008

219_0049.med.jpg

Our plan (target completion dates):

*Date* Description* *Responsible
tick.gif16th Dec Renault transaxle delivered to Ian [BT]
tick.gif4th Feb Brakes Suspension and axles chosen and fitted to Saker [BT, PC]
tick.gif19th Feb Motor drawings and spline details (DIN) delivered to Ian [PC, MS]
...
tick.gif4th Aug Get motor and controller to NZ [PC] (Itsonthewaynowviaseafreight - a bit of slippage here...)
tick.gif7th Aug Deliver Motor to Ian for fitting to transaxle [PC, TP]
tick.gif1st Sept Motor and Transaxle combined and delivered to BT [IJ]
tick.gif6th Sept Motor and transaxle mounted in Saker [BT]
tick.gif12th Sept Temporary lead acid battery and electrical component installation complete [TP, PC, BT]
tick.gif19th Sept NZ Speed Show [PC, MS]
Oct Electric Saker "1st drive" (slow and timid!), exact date to be determined soon [TP, PC, BT - Everyone invited]
...
15th and 16th Nov We are contemplating attending the Whittakers event at Manfeild
22nd Nov Battery upgrade complete (this date is likely to slip, but I'm not updating it just yet) [TP, PC, BT]
28th November Manfeild track test? [TG, BT, TP, PC]
...
Early 2009 Compete in first competitive race (NZSC Series) and don't come last.

Done or in progress:

TODO:

  • Battery - We have our temporary pack sorted, race pack designs are being finalised
  • BMS
  • Testing

Other Stuff:


-- Main.PhilipCourt - 15 Dec 2007