Difference between revisions of "Main Page"

From Saker
Jump to navigationJump to search
(Imported from TWiki by twiki2mediawiki.py)
(Imported from TWiki by twiki2mediawiki.py)
Line 60: Line 60:
 
* [[BMS]] - We are using the [http://sourceforge.net/apps/mediawiki/tumanako/index.php?title=EVD5_BMS EVD5] gen I (gen II version under design)
 
* [[BMS]] - We are using the [http://sourceforge.net/apps/mediawiki/tumanako/index.php?title=EVD5_BMS EVD5] gen I (gen II version under design)
 
* [[Miscellaneous|Misc]] - Various minor jobs that need to be done
 
* [[Miscellaneous|Misc]] - Various minor jobs that need to be done
 +
* Our [[Temporary Pack|temporary pack]] has done its job and has been retired, the car is now being readied for the Race Pack.
 +
* [[Battery]] - Race pack designs are complete and construction is about to begin.
 
TODO:
 
TODO:
* [[Battery]] - We have our [[Temporary Pack|temporary pack]] sorted, race pack designs are being finalised
 
 
* Testing
 
* Testing
 
* BMS requirement (store certifiable one way encrypted(?) full history of battery pack and inividual cell charge and discharge behaviour. This provides valuable info to support resale value of the pack)
 
* BMS requirement (store certifiable one way encrypted(?) full history of battery pack and inividual cell charge and discharge behaviour. This provides valuable info to support resale value of the pack)
Line 79: Line 80:
 
* [[NZ Smart Grid]]
 
* [[NZ Smart Grid]]
 
* [[Possible Diff]]
 
* [[Possible Diff]]
* [[USB-CAN|USB<->CAN]]
+
* [[USB-CAN|USB&lt;-&gt;CAN]]
 
* [[LATA Switch]]
 
* [[LATA Switch]]
 
-- Main.PhilipCourt - 15 Dec 2007
 
-- Main.PhilipCourt - 15 Dec 2007
  
  

Revision as of 10:03, 30 November 2011

219_0049.med.jpg

Our plan (target completion dates):

Date Description Responsible
tick.gif16th Dec Renault transaxle delivered to Ian [BT]
tick.gif4th Feb Brakes Suspension and axles chosen and fitted to Saker [BT, PC]
tick.gif19th Feb Motor drawings and spline details (DIN) delivered to Ian [PC, MS]
...
tick.gif4th Aug Get motor and controller to NZ [PC] (Its on the way now via sea freight - a bit of slippage here...)
tick.gif7th Aug Deliver Motor to Ian for fitting to transaxle [PC, TP]
tick.gif1st Sept Motor and Transaxle combined and delivered to BT [IJ]
tick.gif6th Sept Motor and transaxle mounted in Saker [BT]
tick.gif12th Sept Temporary lead acid battery and electrical component installation complete [TP, PC, BT]
tick.gif19th Sept NZ Speed Show [PC, MS]
...
15th and 16th Nov
tick.gif7th Dec We will be at the Clevedon Markets with the GS750V [PC, TP, MS]
Dec 2008 (hopefully!) Electric Saker "1st drive" (slow and timid!), exact date to be determined soon [TP, PC, BT - Everyone invited] Original Inverter software issues have not been resolved by the manufacturer (EVISOL). In fact they appear to have done a runner from their obligations
...
tick.gifJan 2010 Electric Saker "1st drive" (slow and timid!) [EC, PC] Inverter software issues solved. See http://www.tumanako.net
2011 Battery upgrade complete [TP, PC, EC] - This is the final hurdle and we need to get this right! Technology (and business!?) decisions are narrowing in on a solution (target early 2011 now)
2011 Compete in first competitive race (with the Bikini Pack it will be a hill climb, not the NZSC Series as originally planed) [TG, BT, EC, TP, FK]

Done or in progress:

TODO:

  • Testing
  • BMS requirement (store certifiable one way encrypted(?) full history of battery pack and inividual cell charge and discharge behaviour. This provides valuable info to support resale value of the pack)

Other Stuff: