Difference between revisions of "Main Page"
Jump to navigation
Jump to search
(Imported from TWiki by twiki2mediawiki.py) |
(Updated EVD5 link to sourceforge wiki) |
||
(57 intermediate revisions by 4 users not shown) | |||
Line 4: | Line 4: | ||
{| cellpadding="5" cellspacing="0" border="1" |
{| cellpadding="5" cellspacing="0" border="1" |
||
|- |
|- |
||
− | | |
+ | | '''Date''' || '''Description''' || '''Responsible''' |
|- |
|- |
||
− | |16th Dec|| |
+ | | [[File:tick.gif|link=]]16th Dec || Renault transaxle delivered to Ian || [BT] |
|- |
|- |
||
⚫ | |||
− | |16th Dec||Renault transaxle delivered to Ian||[BT] |
||
|- |
|- |
||
+ | | [[File:tick.gif|link=]]19th Feb || Motor drawings and spline details (DIN) delivered to Ian || [PC, MS] |
||
− | |<strike>14th Jan||<strike>Get motor and controller to NZ, bench test and deliver Motor to Ian for fitting to transaxle||<strike>[PC, TP] (if we can meet this agressive target it will fit well with Ian's holiday staffing plans) </strike> |
||
|- |
|- |
||
⚫ | |||
⚫ | |||
|- |
|- |
||
+ | | [[File:tick.gif|link=]]4th Aug || Get motor and controller to NZ || [PC] ([[Its On The Way Now Via Sea Freight|Its on the way now via sea freight]] - a bit of slippage here...) |
||
⚫ | |||
|- |
|- |
||
+ | | [[File:tick.gif|link=]]7th Aug || Deliver Motor to Ian for fitting to transaxle || [PC, TP] |
||
− | |<strike>25th Feb||<strike>Motor and transaxle mounted in Saker||<strike>[BT]</strike> |
||
|- |
|- |
||
⚫ | |||
⚫ | |||
|- |
|- |
||
⚫ | |||
− | |<strike>15th Mar||<strike>Electric Saker "1st drive" (slow and timid!)||<strike>[TP, PC, BT - Everyone invited]</strike> |
||
|- |
|- |
||
⚫ | |||
⚫ | |||
|- |
|- |
||
+ | | [[File:tick.gif|link=]]19th Sept || [http://www.speedshow.co.nz NZ Speed Show] || [PC, MS] |
||
− | |5th May||Get motor and controller to NZ, bench test and deliver Motor to Ian for fitting to transaxle||[PC, TP] (Controller will be available in Feburary and Motor has a 16 week lead time due to manufacturing time - not available from stock) |
||
|- |
|- |
||
⚫ | |||
− | |26th May||Motor and Transaxle combined and delivered to BT||[IJ] |
||
|- |
|- |
||
+ | | <strike>15th and 16th Nov</strike> || <strike>We are contemplating attending the [http://www.mgcarclub.org.nz/whittakers.html Whittakers] event at [http://www.manfeild.co.nz/events.asp Manfeild]</strike> | |
||
⚫ | |||
|- |
|- |
||
+ | | [[File:tick.gif|link=]]7th Dec || We will be at the [http://www.clevedonfarmersmarket.co.nz Clevedon Markets] with the GS750V || [PC, TP, MS] |
||
− | |21st June||Electric Saker "1st drive" (slow and timid!)||[TP, PC, BT - Everyone invited] |
||
|- |
|- |
||
+ | | <strike>Dec 2008 (hopefully!)</strike> || <strike>Electric Saker "1st drive" (slow and timid!), exact date to be determined soon</strike> || <strike>[TP, PC, BT - Everyone invited]</strike> Original Inverter software issues have not been resolved by the manufacturer (EVISOL). In fact they appear to have [[Done A Runner|done a runner]] from their obligations |
||
⚫ | |||
|- |
|- |
||
+ | | ... || | |
||
− | |2008||Compete in first competitive race and don't come last.|| |
||
+ | |||
+ | |- |
||
+ | |[[File:tick.gif|link=]]Jan 2010||Electric Saker "[http://blog.greenstage.co.nz/2010/01/gs750v-electric-saker-first-drive.html 1st drive]" (slow and timid!)||[EC, PC] Inverter software issues solved. See http://www.tumanako.net |
||
+ | |- |
||
+ | | 2013 || Battery upgrade complete (see [[Battery Construction]]) || [TP, PC, EC] - This is the final hurdle and we need to get this right! Technology (and business!?) decisions are narrowing in on a solution (target Oct 2013) |
||
+ | |- |
||
+ | | 2014 || Compete in first competitive race (with the [[Bikini Pack]] it will be a hill climb, not the [[NZSC Series]] as originally planed) [TG, BT, EC, TP, FK] || |
||
|} |
|} |
||
Done or in progress: |
Done or in progress: |
||
− | * Saker GT |
+ | * [http://www.saker.co.nz Saker GT] |
* [[Brakes]] |
* [[Brakes]] |
||
+ | * [[Wheels And Tyres]] |
||
− | * [[Renault |
+ | * [[Renault UN1 Transaxle]] (UN1-04) |
− | * [http://docs.google.com/Doc?id=dgb6fcnp_34dg4kjh Motor] - ordered (waiting on confirmation of delivery dates, but will definetly be here before 27th April) |
||
+ | * [[IPV5135 Motor]] |
||
− | * [http://docs.google.com/Doc?id=dgb6fcnp_53frhb3dfh Controller] |
||
+ | * [[EVI200 Controller]] |
||
⚫ | |||
+ | * [[Clutch]] - yes we are using a clutch (long term we plan on having computer controlled gear change to eliminate the clutch) |
||
− | |||
+ | * [[Charger]] - Using three chargers to get pack fully charged in ~2hrs |
||
⚫ | |||
− | * [[Connectorsand Cabling]] |
||
⚫ | |||
− | * [http://www.brusa.biz/products/e_nlg5112.htm charger] - To go with metricmind BMS? Need at least two chargers to get pack to full 900 V |
||
* [[Water Pump]] |
* [[Water Pump]] |
||
+ | * [[Radiator]] |
||
− | |||
+ | * [[DC-DC Converter]] - We will be using a small auxiliary battery which we will charge independently between races |
||
− | |||
+ | * [[Connectors And Cabling|Connectors, cabling and fuses]] |
||
⚫ | |||
+ | * [[BMS]] - We are using the [http://tumanako.sourceforge.net/wiki/index.php/EVD5_BMS EVD5] gen I (gen II version under design) |
||
+ | * [[Miscellaneous|Misc]] - Various minor jobs that need to be done |
||
+ | * Our [[Temporary Pack|temporary pack]] has done its job and has been retired, the car is now being readied for the Race Pack. |
||
+ | * [[Battery]] - Race pack designs are complete and [[Battery Construction]] is about to begin. |
||
⚫ | |||
+ | * Testing |
||
+ | * BMS requirement (store certifiable one way encrypted(?) full history of battery pack and inividual cell charge and discharge behaviour. This provides valuable info to support resale value of the pack) |
||
⚫ | |||
* [[Performance]] |
* [[Performance]] |
||
+ | * [[Range]] |
||
+ | * [[Regulations]] |
||
⚫ | |||
+ | * [[Safety]] |
||
+ | * [[High Power Inverters]] |
||
+ | * [[Power Stages]] |
||
+ | * [[Future Dash]] |
||
+ | * [[Future Gearbox]] - replacement for UN1 |
||
+ | * [[Linux Conf 2010 Abstract]] |
||
+ | * [[Shire Electrical Conversion]] |
||
+ | * [[KillaCycle Down Under 2010]] |
||
+ | * [[NZ Smart Grid]] |
||
+ | * [[Possible Diff]] |
||
+ | * [[USB-CAN|USB<->CAN]] |
||
+ | * [[LATA Switch]] |
||
+ | * [[2 Speed Gearbox]] |
||
+ | * [[Dyno]] |
||
+ | * [[Speedway]] |
||
⚫ | |||
+ | * [[SolarNode]] |
||
+ | * [http://web.archive.org/web/20110403145750/http://sourceforge.net/apps/wordpress/tumanako/feed Old Sourceforge Blog] |
||
-- Main.PhilipCourt - 15 Dec 2007 |
-- Main.PhilipCourt - 15 Dec 2007 |
||
− | |||
− |
Latest revision as of 21:13, 28 June 2015
Our plan (target completion dates):
Date | Description | Responsible |
16th Dec | Renault transaxle delivered to Ian | [BT] |
4th Feb | Brakes Suspension and axles chosen and fitted to Saker | [BT, PC] |
19th Feb | Motor drawings and spline details (DIN) delivered to Ian | [PC, MS] |
... | ||
4th Aug | Get motor and controller to NZ | [PC] (Its on the way now via sea freight - a bit of slippage here...) |
7th Aug | Deliver Motor to Ian for fitting to transaxle | [PC, TP] |
1st Sept | Motor and Transaxle combined and delivered to BT | [IJ] |
6th Sept | Motor and transaxle mounted in Saker | [BT] |
12th Sept | Temporary lead acid battery and electrical component installation complete | [TP, PC, BT] |
19th Sept | NZ Speed Show | [PC, MS] |
... | ||
7th Dec | We will be at the Clevedon Markets with the GS750V | [PC, TP, MS] |
... | ||
Jan 2010 | Electric Saker "1st drive" (slow and timid!) | [EC, PC] Inverter software issues solved. See http://www.tumanako.net |
2013 | Battery upgrade complete (see Battery Construction) | [TP, PC, EC] - This is the final hurdle and we need to get this right! Technology (and business!?) decisions are narrowing in on a solution (target Oct 2013) |
2014 | Compete in first competitive race (with the Bikini Pack it will be a hill climb, not the NZSC Series as originally planed) [TG, BT, EC, TP, FK] |
Done or in progress:
- Saker GT
- Brakes
- Wheels And Tyres
- Renault UN1 Transaxle (UN1-04)
- IPV5135 Motor
- EVI200 Controller
- Clutch - yes we are using a clutch (long term we plan on having computer controlled gear change to eliminate the clutch)
- Charger - Using three chargers to get pack fully charged in ~2hrs
- Water Pump
- Radiator
- DC-DC Converter - We will be using a small auxiliary battery which we will charge independently between races
- Connectors, cabling and fuses
- BMS - We are using the EVD5 gen I (gen II version under design)
- Misc - Various minor jobs that need to be done
- Our temporary pack has done its job and has been retired, the car is now being readied for the Race Pack.
- Battery - Race pack designs are complete and Battery Construction is about to begin.
TODO:
- Testing
- BMS requirement (store certifiable one way encrypted(?) full history of battery pack and inividual cell charge and discharge behaviour. This provides valuable info to support resale value of the pack)
Other Stuff:
- Performance
- Range
- Regulations
- Battery Recycling
- Safety
- High Power Inverters
- Power Stages
- Future Dash
- Future Gearbox - replacement for UN1
- Linux Conf 2010 Abstract
- Shire Electrical Conversion
- KillaCycle Down Under 2010
- NZ Smart Grid
- Possible Diff
- USB<->CAN
- LATA Switch
- 2 Speed Gearbox
- Dyno
- Speedway
- BMS Master RS485
- SolarNode
- Old Sourceforge Blog
-- Main.PhilipCourt - 15 Dec 2007