Difference between revisions of "Main Page"
Jump to navigation
Jump to search
(Imported from TWiki by twiki2mediawiki.py) |
(Imported from TWiki by twiki2mediawiki.py) |
||
Line 30: | Line 30: | ||
|<strike>15th and 16th Nov</strike>|| <strike>We are contemplating attending the [http://www.mgcarclub.org.nz/whittakers.html Whittakers] event at [http://www.manfeild.co.nz/events.asp Manfeild]</strike>| |
|<strike>15th and 16th Nov</strike>|| <strike>We are contemplating attending the [http://www.mgcarclub.org.nz/whittakers.html Whittakers] event at [http://www.manfeild.co.nz/events.asp Manfeild]</strike>| |
||
|- |
|- |
||
− | |7th Dec|| We will be at the [http://www.clevedonfarmersmarket.co.nz Clevedon Markets] with the GS750V||[PC, TP, MS] |
+ | |[[File:tick.gif|link=]]7th Dec|| We will be at the [http://www.clevedonfarmersmarket.co.nz Clevedon Markets] with the GS750V||[PC, TP, MS] |
|- |
|- |
||
− | |Dec (hopefully!)||Electric Saker "1st drive" (slow and timid!), exact date to be determined soon||[TP, PC, BT - Everyone invited] |
+ | |<strike>Dec (hopefully!)</strike>||<strike>Electric Saker "1st drive" (slow and timid!), exact date to be determined soon</strike>||<strike>[TP, PC, BT - Everyone invited]</strike> Inverter software issues continue to dog us - Currently working with manufacturer... |
|- |
|- |
||
|...|| | |
|...|| | |
||
Line 55: | Line 55: | ||
* [[DC-DC Converter]] - We will be using a small auxiliary battery which we will charge independently between races |
* [[DC-DC Converter]] - We will be using a small auxiliary battery which we will charge independently between races |
||
* [[Connectorsand Cabling|Connectors, cabling and fuses]] |
* [[Connectorsand Cabling|Connectors, cabling and fuses]] |
||
+ | * [[Miscellaneous|Misc]] - Various minor jobs that need to be done |
||
TODO: |
TODO: |
Revision as of 11:04, 26 January 2009
Our plan (target completion dates):
*Date* | Description* | *Responsible |
16th Dec | Renault transaxle delivered to Ian | [BT] |
4th Feb | Brakes Suspension and axles chosen and fitted to Saker | [BT, PC] |
19th Feb | Motor drawings and spline details (DIN) delivered to Ian | [PC, MS] |
... | ||
4th Aug | Get motor and controller to NZ | [PC] (Itsonthewaynowviaseafreight - a bit of slippage here...) |
7th Aug | Deliver Motor to Ian for fitting to transaxle | [PC, TP] |
1st Sept | Motor and Transaxle combined and delivered to BT | [IJ] |
6th Sept | Motor and transaxle mounted in Saker | [BT] |
12th Sept | Temporary lead acid battery and electrical component installation complete | [TP, PC, BT] |
19th Sept | NZ Speed Show | [PC, MS] |
... | ||
7th Dec | We will be at the Clevedon Markets with the GS750V | [PC, TP, MS] |
... | ||
2009 | Battery upgrade complete | [TP, PC, BT] |
2009 | Compete in first competitive race (NZSC Series) and don't come last. |
Done or in progress:
- Saker GT
- Brakes
- Wheelsand Tyres
- Renault UN1transaxle (UN1-04)
- IPV5135 Motor
- EVI200 Controller
- Clutch - yes we are using a clutch (long term we plan on having computer controlled gear change to eliminate the clutch)
- Charger - Using three chargers to get pack fully charged in ~2hrs
- Water Pump
- Radiator
- DC-DC Converter - We will be using a small auxiliary battery which we will charge independently between races
- Connectors, cabling and fuses
- Misc - Various minor jobs that need to be done
TODO:
Other Stuff:
-- Main.PhilipCourt - 15 Dec 2007