Difference between revisions of "Miscellaneous"
Jump to navigation
Jump to search
Line 14: | Line 14: | ||
| 19th-23rd Dec || Action - * Easy panel access to E Vision 2 controls(modify some interior panels to allow quick easy access when required) || [SM] |
| 19th-23rd Dec || Action - * Easy panel access to E Vision 2 controls(modify some interior panels to allow quick easy access when required) || [SM] |
||
|- |
|- |
||
− | | 19th-23rd Dec || * Re-home the new contactors in front of motor || [SM] |
+ | | 19th-23rd Dec || * Re-home the new contactors in front of motor || [SM, EC] |
|- |
|- |
||
| 19th-23rd Dec || Design Options - * Re-home the inverter for new battery pack (New inverter frame on top of motor OR indent aluminium fire wall and place behind passenger seat) || [SM] |
| 19th-23rd Dec || Design Options - * Re-home the inverter for new battery pack (New inverter frame on top of motor OR indent aluminium fire wall and place behind passenger seat) || [SM] |
||
Line 27: | Line 27: | ||
|- |
|- |
||
| no set time || '''Secure Aux 12V battery''' || [SM] |
| no set time || '''Secure Aux 12V battery''' || [SM] |
||
− | |- |
||
− | | no set time || Clutch back stop (to prevent over extension)|| [SM] |
||
|- |
|- |
||
| no set time || Re-home the inverter for new battery pack (New inverter frame on top of motor)|| [SM] |
| no set time || Re-home the inverter for new battery pack (New inverter frame on top of motor)|| [SM] |
||
− | |- |
||
− | | no set time || Re-home the new contactors in front of motor || [SM,EC] |
||
|- |
|- |
||
| no set time || Replace low voltage EVision with new high voltage EVision 2. - in progress...|| [SM,PC,EC] |
| no set time || Replace low voltage EVision with new high voltage EVision 2. - in progress...|| [SM,PC,EC] |
Revision as of 00:12, 21 December 2011
This page is our TODO list for minor jobs. The Team will knock these off during scheduled windows of opportunity (where the vehicle is available to be worked on for such jobs). Please put your name against an item if you wish to do it.
Scheduled work:
Date | Description | Responsible |
5th Dec | * Remove lead acid pack framing | [SM] |
5th Dec | * Remove unused suspension bracket | [SM] |
7th Dec | * *clutch back stop (to prevent over extension) | [PC, SM] |
19th-23rd Dec | Action - * Easy panel access to E Vision 2 controls(modify some interior panels to allow quick easy access when required) | [SM] |
19th-23rd Dec | * Re-home the new contactors in front of motor | [SM, EC] |
19th-23rd Dec | Design Options - * Re-home the inverter for new battery pack (New inverter frame on top of motor OR indent aluminium fire wall and place behind passenger seat) | [SM] |
19th-23rd Dec | * Data logger (wiring for data logger and GPS needs to be completed - separate harness for this | [SM] |
no set time | * Dyno - build of a frame / bracket to hold motors together | [SM] |
19th-23rd Dec | * PCB mounting in junction box - part of replacing low voltage EVision with new high voltage EVision 2 | [SM] |
no set time | Source 12V battery (possibly a submodule of main pack) | [PC] |
no set time | Secure Aux 12V battery | [SM] |
no set time | Re-home the inverter for new battery pack (New inverter frame on top of motor) | [SM] |
no set time | Replace low voltage EVision with new high voltage EVision 2. - in progress... | [SM,PC,EC] |
no set time | * Torque brace for transaxle | [SM] |
no set time | * Dash wiring (Key, wiper, rain light and Dash2 menu control wiring needs to be completed) | [SM] |
no set time | * Data logger (wiring for data logger and GPS needs to be completed - separate harness for this | [SM] |
no set time | *Silicone and tape pins in the axle | [SM] |
- *Check torque settings on axle and drivetrain (see blog!)
- Wheel alignment needed
- Liquid to the radiator and cooling system
- Replace the rear wheel nuts as well (for consistency with front - requires studs to be shortened or replaced)
- Gear leaver mechanical connection (Standard Saker setup needs to be modified due to chassis variations)
- Pin missing from rear body panel
- Fit fire extinguisher
Done:
Remove lead acid pack framingRemove unused suspension bracket[SM]Fit wing mirror (we have the missing mirror now! Need to purchase suitable fixing screw/bolt)[EC, PC]Fix crack in body panel above rear wheel (need to purchase fiber glass mat)[PC]Organise safe place to store body panel while working on car for long periods! (i.e. In the front of the crate)[PC]Slots in seats for harness[FC, PC]Padlocks[PC]*Front wheel spacers* Bruce says spacers not needed, machine the nuts to sort this out!(we have replaced the the wheel studs and nuts) [EC, PC]Get clutch working (hydraulic line is not properly connected or bled)[EC, FC, PC]
-- Main.PhilipCourt - 25 Jan 2009