The Saker bikini pack is made up of two 5kWh batteries, one either side of the motor (the Saker will run on one battery pack, but it is designed to have 2 batteries for HCS race spec performance).
+
The Saker bikini pack is made up of two 5kWh batteries (which are in turn made up of twenty two of our A123 [[Bikini|sub modules]], which are 227.7 Wh each), one either side of the motor (the Saker will run on one battery pack, but it is designed to have 2 batteries for HCS race spec performance).
   
Here is our 2013 schedule to complete both batteries and the commissioning by 31st October:
+
Here is our task list to complete both batteries and the commissioning:
 
* FR4 separators (Done) [EC, PC]
 
* FR4 separators (Done) [EC, PC]
* 31st July - Complete battery enclosure design (Done) [PS, EC, PC]
+
* Complete battery enclosure design (Done) [PS, EC, PC]
* 10th July - Tower #1 test (our batteries are made of 4 towers) [EC, PC]
+
* Tower #1 test (our batteries are made of 4 towers) [EC, PC]
* 7th Aug - Enclosure complete (Done) [PS]
+
* Enclosure complete (Done) [PS]
  +
* Chassis mods (in Progress) [GO]
* 31st July - Battery #1 build [EC, PC]
 
* 10/11th August - Battery #1 test and test drive [EC, TP, PC]
+
* Mini enclosure for contactor and fuse at top of pack [PC]
 
* Battery #1 build [EC, PC]
  +
* Battery #1 test and test drive [EC, TP, PC]
 
* Battery #2 build
 
* Battery #2 build
**11th Sept - all modules built [EC, PC]
+
**All modules built [EC, PC]
**9th Oct - all towers built [EC, PC]
+
**All towers built [EC, PC]
**19th Oct - Battery #2 test [EC, TP, PC]
+
**Battery #2 test [EC, TP, PC]
*31st Oct - Saker shake down complete [TG, EC, PC]
+
*Saker shake down complete [TG, EC, PC]
* April - Chassis mods [GO]
 
* April - Mini enclosure for contactor and fuse at top of pack [PC]
 
   
   

Latest revision as of 03:36, 2 August 2017

The Saker bikini pack is made up of two 5kWh batteries (which are in turn made up of twenty two of our A123 sub modules, which are 227.7 Wh each), one either side of the motor (the Saker will run on one battery pack, but it is designed to have 2 batteries for HCS race spec performance).

Here is our task list to complete both batteries and the commissioning:

  • FR4 separators (Done) [EC, PC]
  • Complete battery enclosure design (Done) [PS, EC, PC]
  • Tower #1 test (our batteries are made of 4 towers) [EC, PC]
  • Enclosure complete (Done) [PS]
  • Chassis mods (in Progress) [GO]
  • Mini enclosure for contactor and fuse at top of pack [PC]
  • Battery #1 build [EC, PC]
  • Battery #1 test and test drive [EC, TP, PC]
  • Battery #2 build
    • All modules built [EC, PC]
    • All towers built [EC, PC]
    • Battery #2 test [EC, TP, PC]
  • Saker shake down complete [TG, EC, PC]