Difference between revisions of "Main Page"

From Saker
Jump to navigation Jump to search
(Imported from TWiki by twiki2mediawiki.py)
(Imported from TWiki by twiki2mediawiki.py)
Line 14: Line 14:
 
|...|| |
 
|...|| |
 
|-
 
|-
|21st July||Get motor and controller to NZ||[PC] (Its on the way now via sea freight - a bit of slippage here...)
+
|31st July||Get motor and controller to NZ||[PC] ([[Itsonthewaynowviaseafreight]] - a bit of slippage here...)
 
|-
 
|-
|28th July||Bench test complete and deliver Motor to Ian for fitting to transaxle||[PC, TP]
+
|4th Aug||Bench test complete and deliver Motor to Ian for fitting to transaxle||[PC, TP]
 
|-
 
|-
|18th Aug||Motor and Transaxle combined and delivered to BT||[IJ]
+
|25th Aug||Motor and Transaxle combined and delivered to BT||[IJ]
 
|-
 
|-
|25th Aug||Motor and transaxle mounted in Saker||[BT]
+
|1st Sept||Motor and transaxle mounted in Saker||[BT]
 
|-
 
|-
|13th Sept||Temporary lead acid battery and electrical component installation complete||[TP, PC, BT]
+
|20th Sept||Temporary lead acid battery and electrical component installation complete||[TP, PC, BT]
 
|-
 
|-
|14th Sept||Electric Saker "1st drive" (slow and timid!)||[TP, PC, BT - Everyone invited]
+
|21th Sept||Electric Saker "1st drive" (slow and timid!)||[TP, PC, BT - Everyone invited]
 
|-
 
|-
 
|...|| |
 
|...|| |

Revision as of 00:09, 29 June 2008

219_0049.med.jpg

Our plan (target completion dates):

*Date* Description* *Responsible
tick.gif16th Dec Renault transaxle delivered to Ian [BT]
tick.gif4th Feb Brakes Suspension and axles chosen and fitted to Saker [BT, PC]
tick.gif19th Feb Motor drawings and spline details (DIN) delivered to Ian [PC, MS]
...
31st July Get motor and controller to NZ [PC] (Itsonthewaynowviaseafreight - a bit of slippage here...)
4th Aug Bench test complete and deliver Motor to Ian for fitting to transaxle [PC, TP]
25th Aug Motor and Transaxle combined and delivered to BT [IJ]
1st Sept Motor and transaxle mounted in Saker [BT]
20th Sept Temporary lead acid battery and electrical component installation complete [TP, PC, BT]
21th Sept Electric Saker "1st drive" (slow and timid!) [TP, PC, BT - Everyone invited]
...
22nd Nov Battery upgrade complete [TP, PC, BT]
28th November Manfeild track test [TG, BT, TP, PC]
...
Late 2008 Compete in first competitive race (NZSC Series) and don't come last.

Done or in progress:


TODO:


Other Stuff:


-- Main.PhilipCourt - 15 Dec 2007