Difference between revisions of "Main Page"

From Saker
Jump to navigation Jump to search
(Imported from TWiki by twiki2mediawiki.py)
(Imported from TWiki by twiki2mediawiki.py)
Line 4: Line 4:
 
{| cellpadding="5" cellspacing="0" border="1"
 
{| cellpadding="5" cellspacing="0" border="1"
 
|-
 
|-
|*Date*|| '''Description*||*Responsible'''
+
| '''Date''' || '''Description''' || '''Responsible'''
 
|-
 
|-
|[[File:tick.gif|link=]]16th Dec||Renault transaxle delivered to Ian||[BT]
+
| [[File:tick.gif|link=]]16th Dec || Renault transaxle delivered to Ian || [BT]
 
|-
 
|-
|[[File:tick.gif|link=]]4th Feb||Brakes Suspension and axles chosen and fitted to Saker||[BT, PC]
+
| [[File:tick.gif|link=]]4th Feb || Brakes Suspension and axles chosen and fitted to Saker || [BT, PC]
 
|-
 
|-
|[[File:tick.gif|link=]]19th Feb||Motor drawings and spline details (DIN) delivered to Ian||[PC, MS]
+
| [[File:tick.gif|link=]]19th Feb || Motor drawings and spline details (DIN) delivered to Ian || [PC, MS]
 
|-
 
|-
|...|| |
+
| ... || |
 
|-
 
|-
|[[File:tick.gif|link=]]4th Aug||Get motor and controller to NZ||[PC] ([[Itsonthewaynowviaseafreight]] - a bit of slippage here...)
+
| [[File:tick.gif|link=]]4th Aug || Get motor and controller to NZ || [PC] ([[Itsonthewaynowviaseafreight]] - a bit of slippage here...)
 
|-
 
|-
|[[File:tick.gif|link=]]7th Aug||Deliver Motor to Ian for fitting to transaxle||[PC, TP]
+
| [[File:tick.gif|link=]]7th Aug || Deliver Motor to Ian for fitting to transaxle || [PC, TP]
 
|-
 
|-
|[[File:tick.gif|link=]]1st Sept||Motor and Transaxle combined and delivered to BT||[IJ]
+
| [[File:tick.gif|link=]]1st Sept || Motor and Transaxle combined and delivered to BT || [IJ]
 
|-
 
|-
|[[File:tick.gif|link=]]6th Sept||Motor and transaxle mounted in Saker||[BT]
+
| [[File:tick.gif|link=]]6th Sept || Motor and transaxle mounted in Saker || [BT]
 
|-
 
|-
|[[File:tick.gif|link=]]12th Sept||Temporary lead acid battery and electrical component installation complete||[TP, PC, BT]
+
| [[File:tick.gif|link=]]12th Sept || Temporary lead acid battery and electrical component installation complete || [TP, PC, BT]
 
|-
 
|-
|[[File:tick.gif|link=]]19th Sept||[http://www.speedshow.co.nz NZ Speed Show]||[PC, MS]
+
| [[File:tick.gif|link=]]19th Sept || [http://www.speedshow.co.nz NZ Speed Show] || [PC, MS]
 
|-
 
|-
|...|| |
+
| ... || |
 
|-
 
|-
|<strike>15th and 16th Nov</strike>|| <strike>We are contemplating attending the [http://www.mgcarclub.org.nz/whittakers.html Whittakers] event at [http://www.manfeild.co.nz/events.asp Manfeild]</strike>|
+
| <strike>15th and 16th Nov</strike> || <strike>We are contemplating attending the [http://www.mgcarclub.org.nz/whittakers.html Whittakers] event at [http://www.manfeild.co.nz/events.asp Manfeild]</strike> |
 
|-
 
|-
|[[File:tick.gif|link=]]7th Dec|| We will be at the [http://www.clevedonfarmersmarket.co.nz Clevedon Markets] with the GS750V||[PC, TP, MS]
+
| [[File:tick.gif|link=]]7th Dec || We will be at the [http://www.clevedonfarmersmarket.co.nz Clevedon Markets] with the GS750V || [PC, TP, MS]
 
|-
 
|-
|<strike>Dec 2008 (hopefully!)</strike>||<strike>Electric Saker "1st drive" (slow and timid!), exact date to be determined soon</strike>||<strike>[TP, PC, BT - Everyone invited]</strike> Original Inverter software issues have not been resolved by the manufacturer (EVISOL). In fact they appear to have [[donearunner]] from their obligations
+
| <strike>Dec 2008 (hopefully!)</strike> || <strike>Electric Saker "1st drive" (slow and timid!), exact date to be determined soon</strike> || <strike>[TP, PC, BT - Everyone invited]</strike> Original Inverter software issues have not been resolved by the manufacturer (EVISOL). In fact they appear to have [[donearunner]] from their obligations
 
|-
 
|-
|...|| |
+
| ... || |
  +
 
|-
 
|-
 
|[[File:tick.gif|link=]]Jan 2010||Electric Saker "[http://blog.greenstage.co.nz/2010/01/gs750v-electric-saker-first-drive.html 1st drive]" (slow and timid!)||[EC, PC] Inverter software issues solved. See http://www.tumanako.net
 
|[[File:tick.gif|link=]]Jan 2010||Electric Saker "[http://blog.greenstage.co.nz/2010/01/gs750v-electric-saker-first-drive.html 1st drive]" (slow and timid!)||[EC, PC] Inverter software issues solved. See http://www.tumanako.net
 
|-
 
|-
|2011||Battery upgrade complete||[TP, PC, EC] - This is the final hurdle and we need to get this right! Technology (and business!?) decisions are narrowing in on a solution (target early 2011 now)
+
| 2011 || Battery upgrade complete || [TP, PC, EC] - This is the final hurdle and we need to get this right! Technology (and business!?) decisions are narrowing in on a solution (target early 2011 now)
 
|-
 
|-
|2011||Compete in first competitive race (with the [[Bikini Pack]] it will be a hill climb, not the [[NZSC Series]] as originally planed) [TG, BT, EC, TP, FK]||
+
| 2011 || Compete in first competitive race (with the [[Bikini Pack]] it will be a hill climb, not the [[NZSC Series]] as originally planed) [TG, BT, EC, TP, FK] ||
   
 
|}
 
|}
Line 48: Line 49:
 
* [[Brakes]]
 
* [[Brakes]]
 
* [[Wheelsand Tyres]]
 
* [[Wheelsand Tyres]]
* [[Renault UN1transaxle]] (UN1-04)
+
* [[Renault UN1transaxle]] (UN1-04)
 
* [[IPV5135 Motor]]
 
* [[IPV5135 Motor]]
* [[EVI200 Controller]]
+
* [[EVI200 Controller]]
 
* [[Clutch]] - yes we are using a clutch (long term we plan on having computer controlled gear change to eliminate the clutch)
 
* [[Clutch]] - yes we are using a clutch (long term we plan on having computer controlled gear change to eliminate the clutch)
 
* [[Charger]] - Using three chargers to get pack fully charged in ~2hrs
 
* [[Charger]] - Using three chargers to get pack fully charged in ~2hrs
Line 58: Line 59:
 
* [[Connectorsand Cabling|Connectors, cabling and fuses]]
 
* [[Connectorsand Cabling|Connectors, cabling and fuses]]
 
* [[Miscellaneous|Misc]] - Various minor jobs that need to be done
 
* [[Miscellaneous|Misc]] - Various minor jobs that need to be done
 
 
TODO:
 
TODO:
 
* [[Battery]] - We have our [[temporarypack]] sorted, race pack designs are being finalised
 
* [[Battery]] - We have our [[temporarypack]] sorted, race pack designs are being finalised
 
* [[BMS. Web Home|BMS]]
 
* [[BMS. Web Home|BMS]]
 
* Testing
 
* Testing
  +
* BMS requirement (store certifiable one way encrypted(?) full history of battery pack and inividual cell charge and discharge behaviour. This provides valuable info to support resale value of the pack)
 
 
Other Stuff:
 
Other Stuff:
 
* [[Performance]]
 
* [[Performance]]
Line 79: Line 79:
 
* [[NZ Smart Grid]]
 
* [[NZ Smart Grid]]
 
* [[Possible Diff]]
 
* [[Possible Diff]]
 
   
 
-- Main.PhilipCourt - 15 Dec 2007
 
-- Main.PhilipCourt - 15 Dec 2007
 
   

Revision as of 11:04, 19 January 2011

219_0049.med.jpg

Our plan (target completion dates):

Date Description Responsible
tick.gif16th Dec Renault transaxle delivered to Ian [BT]
tick.gif4th Feb Brakes Suspension and axles chosen and fitted to Saker [BT, PC]
tick.gif19th Feb Motor drawings and spline details (DIN) delivered to Ian [PC, MS]
...
tick.gif4th Aug Get motor and controller to NZ [PC] (Itsonthewaynowviaseafreight - a bit of slippage here...)
tick.gif7th Aug Deliver Motor to Ian for fitting to transaxle [PC, TP]
tick.gif1st Sept Motor and Transaxle combined and delivered to BT [IJ]
tick.gif6th Sept Motor and transaxle mounted in Saker [BT]
tick.gif12th Sept Temporary lead acid battery and electrical component installation complete [TP, PC, BT]
tick.gif19th Sept NZ Speed Show [PC, MS]
...
15th and 16th Nov
tick.gif7th Dec We will be at the Clevedon Markets with the GS750V [PC, TP, MS]
Dec 2008 (hopefully!) Electric Saker "1st drive" (slow and timid!), exact date to be determined soon [TP, PC, BT - Everyone invited] Original Inverter software issues have not been resolved by the manufacturer (EVISOL). In fact they appear to have donearunner from their obligations
...
tick.gifJan 2010 Electric Saker "1st drive" (slow and timid!) [EC, PC] Inverter software issues solved. See http://www.tumanako.net
2011 Battery upgrade complete [TP, PC, EC] - This is the final hurdle and we need to get this right! Technology (and business!?) decisions are narrowing in on a solution (target early 2011 now)
2011 Compete in first competitive race (with the Bikini Pack it will be a hill climb, not the NZSC Series as originally planed) [TG, BT, EC, TP, FK]

Done or in progress:

TODO:

  • Battery - We have our temporarypack sorted, race pack designs are being finalised
  • BMS
  • Testing
  • BMS requirement (store certifiable one way encrypted(?) full history of battery pack and inividual cell charge and discharge behaviour. This provides valuable info to support resale value of the pack)

Other Stuff:

-- Main.PhilipCourt - 15 Dec 2007